Loading

In the News

blank space
I-90 Eastbound Reconstruction near Cactus Flats
blank space

For Immediate Release:  Thursday, April 3, 2014

Contact: Auston Harris, 605-394-2247

 

I-90 Eastbound Reconstruction near Cactus Flats

 

WALL, S.D. – On Monday, April 7, 2014, Knife River Midwest, LLC will begin work on a nine-mile reconstruction project on Interstate 90 east of Wall from mile marker 123 to 132, near Cactus Flats.

 

The $14.7 million dollar project involves grading, removing and replacing the concrete pavement, installing edge drains, and paving new asphalt shoulders on the eastbound lanes of I-90. 

 

Traffic on I-90 in the construction zone will be reduced to one-lane in each direction and two-way traffic maintained in the westbound lane with a 16-foot width restriction. 

 

Motorists are asked to watch for slowing traffic, merging lanes, construction equipment entering and existing the work zone, and construction workers.

 

The speed limit on I-90 will be reduced to 65 mph for the two-way traffic in the westbound lanes.

 

Before traffic is moved to the westbound lanes, work will be done at the bridge ends with single lane closures required and a speed limit of 45 mph when workers are present adjacent to the closed lane.

 

The Exit 127 eastbound on- and off-ramps will be closed during construction. Eastbound off-ramp traffic will be detoured to Exit 131 and eastbound on-ramp traffic will detoured to Exit 121.

 

All work is scheduled to be completed by Oct. 24, 2014.

 

For more information, contact Auston Harris with the South Dakota Department of Transportation at 605-394-2247.

 

Complete road construction information can be found at www.safetravelusa.com/sd or by dialing 511.

 

- 30 -

blank space