Loading

In the News

blank space
ADA Upgrades on Highway 11 through Brandon
blank space

For Immediate Release:  Thursday, April 24, 2019

Contact: Mike Border, Project Engineer, 605-367-5680

 

 

SIOUX FALLS, S.D. – BX Civil and Construction will begin ADA upgrades on Highway 11 through Brandon on Monday, April 30, 2019.

 

Motorists can expect single lane closures while the contractor begins removing concrete at various intersections through Brandon. Additional, periodic lane closures will be utilized through the project to complete the sidewalk ramps adjacent to the Highway.

 

As part of these upgrades, a traffic signal will be installed at Highway 11 and Holly Boulevard later this summer.

 

For complete road construction information, visit www.safetravelusa.com/sd or dial 511.

 

- 30 -

blank space